Bottleneck Analysis and Spreadsheet-Based Simulation for Enhancing Jersey Production Capacity at CV Wirakundara
DOI:
https://doi.org/10.33062/mjb.v11i01.125Keywords:
Bottleneck, Simulasi, Utilisasi Operator, Manufaktur PakaianAbstract
CV Wirakundara, a garment manufacturing company located in Sariwates, Bandung, faces uncertainty regarding its actual jersey production capacity and the utilization levels of operators in its sewing line. This study aims to (1) identify the actual process capacity of jersey production and determine its bottleneck point, and (2) measure the average performance and utilization of each operator. The study employs the Bottleneck Analysis method to address the first objective and Spreadsheet-Based Computer Simulation to address the second objective. The results of the bottleneck analysis indicate that the overlocking process, with a processing time of 5 minutes, is the most critical bottleneck in the production line. By adding one operator and one overlocking machine, the cycle time can be reduced to 2.5 minutes, thereby increasing production capacity from approximately 96 pieces per day to 192 pieces per day. The simulation results reveal that the utilization rates of Operator A and Operator B are 86.95% and 78.29%, respectively, with average waiting times of 21 seconds and 36 seconds. This study proposes several improvement recommendations, including enhancing the overlocking process, providing intermediate storage areas between production stages, and conducting further evaluation and training for operators to improve production capacity at CV Wirakundara
References
Azad, M. A. (2025). Sustainable Manufacturing Practices in the Apparel Industry: Integrating Eco-Friendly Materials and Processes. https://doi.org/10.36227/techrxiv.175459827.79551250/v1
Bongomin, O., Mwasiagi, J. I., Nganyi, E. O., & Nibikora, I. (2020a). Improvement of garment assembly line efficiency using line balancing technique. Engineering Reports, 2(4). https://doi.org/10.1002/eng2.12157
Bongomin, O., Mwasiagi, J. I., Nganyi, E. O., & Nibikora, I. (2020b). A complex garment assembly line balancing using simulation‐based optimization. Engineering Reports, 2(11). https://doi.org/10.1002/eng2.12258
Chavez-Escobedo, J. J., Hernández-Gress, E. S., Antonio-Cruz, M., & Merlo-Zapata, C. A. (2026). Lean manufacturing model for productivity improvement: application in an apparel SME. International Journal of Lean Six Sigma, 17(8), 232–256. https://doi.org/10.1108/IJLSS-08-2025-0211
Dicken, P. (2003). Global Shift: Reshaping The Global Economic Map In The 21st Century 4th Ed.
Gessesse, Y. H., Gebrehiwot, L. W., & Gebreabzgi, M. A. (2026). Simulation-based optimization and lean integration for garment production efficiency: a case study from Ethiopian apparel manufacturing. International Journal of System Assurance Engineering and Management. https://doi.org/10.1007/s13198-026-03295-9
Heizer, J., & Barry, R. (2008). Manajemen Operasi. Salemba Empat.
Jung, W.-K., Kim, H., Park, Y.-C., Lee, J.-W., & Suh, E. S. (2022). Real-time data-driven discrete-event simulation for garment production lines. Production Planning & Control, 33(5), 480–491. https://doi.org/10.1080/09537287.2020.1830194
Kelton, W. D., Sadowski, R. P., Zupick, N. B., & Swets, N. B. (2015). Simulation with Arena. McGraw-Hill Education. https://books.google.co.id/books?id=WXICoQEACAAJ
Khan, S. A. R., Shah, A. S. A., Yu, Z., & Tanveer, M. (2022). A systematic literature review on circular economy practices: challenges, opportunities and future trends. Journal of Entrepreneurship in Emerging Economies, 14(5), 754–795. https://doi.org/10.1108/JEEE-09-2021-0349
Köksal, D., Strähle, J., Müller, M., & Freise, M. (2017). Social Sustainable Supply Chain Management in the Textile and Apparel Industry—A Literature Review. Sustainability, 9(1), 100. https://doi.org/10.3390/su9010100
Marino, S., Hogue, I. B., Ray, C. J., & Kirschner, D. E. (2008). A methodology for performing global uncertainty and sensitivity analysis in systems biology. Journal of Theoretical Biology, 254(1), 178–196. https://doi.org/10.1016/j.jtbi.2008.04.011
Nabi, Farhatun, Mahmud, Rezwan and Islam, M. M. (2015). Improving sewing section efficiency through utilization of worker capacity by time study technique. International Journal of Textile Science. https://doi.org/http://dx.doi.org/10.5923/j.textile.20150401.01
Oelze, N. (2017). Sustainable Supply Chain Management Implementation–Enablers and Barriers in the Textile Industry. Sustainability, 9(8), 1435. https://doi.org/10.3390/su9081435
Rahman, S. (1998). Theory of constraints. International Journal of Operations & Production Management, 18(4), 336–355. https://doi.org/10.1108/01443579810199720
Saha, C. (2019). Improvement of Efficiency and Productivity Through Machine Balancing in a Sewing Line. Journal of Textile Science & Fashion Technology, 2(4). https://doi.org/10.33552/JTSFT.2019.02.000541
Schunk, D., & Plott, B. (n.d.). Using simulation to analyze supply chains. 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165), 2, 1095–1100. https://doi.org/10.1109/WSC.2000.899070
Skoogh, A., Thürer, M., Subramaniyan, M., Matta, A., & Roser, C. (2023). Throughput bottleneck detection in manufacturing: a systematic review of the literature on methods and operationalization modes. Production & Manufacturing Research, 11(1). https://doi.org/10.1080/21693277.2023.2283031
Tang, J., Dai, Z., Jiang, W., Wu, X., Zhuravkov, M. A., Xue, Z., & Wang, J. (2024). A Comprehensive Review of Theories, Methods, and Techniques for Bottleneck Identification and Management in Manufacturing Systems. Applied Sciences, 14(17), 7712. https://doi.org/10.3390/app14177712
Ummah, M. S. (2019). No 主観的健康感を中心とした在宅高齢者における 健康関連指標に関する共分散構造分析Title. Sustainability (Switzerland), 11(1), 1–14. http://scioteca.caf.com/bitstream/handle/123456789/1091/RED2017-Eng-8ene.pdf?sequence=12&isAllowed=y%0Ahttp://dx.doi.org/10.1016/j.regsciurbeco.2008.06.005%0Ahttps://www.researchgate.net/publication/305320484_SISTEM_PEMBETUNGAN_TERPUSAT_STRATEGI_MELESTARI
Yemane, A., Gebremicheal, G., Meraha, T., & Hailemicheal, M. (2020). Productivity Improvement through Line Balancing by Using Simulation Modeling (Case study Almeda Garment Factory). Journal of Optimization in Industrial Engineering, 13, 153–165. https://doi.org/10.22094/JOIE.2019.567816.1565
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Tomi Tomi, Pudjiati Pudjiati

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.